Site: TPP “Maritza East 3”
Sub-site: Modification to reduce the level of normalised NOx emission below 180mg/Nm3 (normalized at 6% O2), Units 1, 2, 3 and 4.
Main characteristics of the site:
|
Material: steel structures |
The technological task and elaboration of the model for new air ducts are provided by the Project Owner - „Steinmüller engineering” - Germany. Supports’ and hangers’ location, technological loads and the requirements for the new structure are also presented by the Project Owner.
Owner: CONTOUR GLOBAL Maritza East 3 PLC
Project Owner: CONTOUR GLOBAL Maritza East 3 PLC; Steinmüller engineering - Germany
Main Contractor: SIEMENS Limited, Bulgaria
Designed: year 2012 (Unit 4); year 2013 (Unit 3); year 2014 (Unit 2); year 2015 (Unit 1).
In operation since: year 2012 (Unit 4); year 2013 (Unit 3); year 2014 (Unit 2); year 2015 (Unit 1).
Scope of Work: Detail design of steel structures of OFA- Air ducts supports - front and rear walls. Verification of documentation. Consulting services. |