Since the establishment of the company, EKSPRO-2000 realised over 600 designs as a prime contractor or subcontractor for part “Building Structures”. These designs have different scale and complexity.

EKSPRO-2000 prime business focus is the design of building structures of industrial and energy projects in (i.e. nuclear power plants, thermal power plants, gas power plants, water power plants, refineries, pulp and paper factories, chemical plants, metallurgical plants, pharmaceutical plants etc.).

In addition to the industrial designs, the company produces numerous designs of residential buildings, such as family and residential houses, administrative and office buildings, warehouses etc.



 















  • TPP “Maritza East 2” - Flue gas desulphurisation system, Units 7 and 8

Site: TPP “Maritza East 2”, Units 7 and 8

Sub-site: Flue gas desulphurisation system, Unit 7 and 8. Support structures for GRP stacks

Main characteristics of the site:

Material: GRP material (stack); steel structure (support structure)
Height: 135 metres (stack); 120 metres and 33 metres (support structure)
Diameter: 6.50 metres (stack)
Weight: 1100 tones (support structure)

Construction of two new GRP flue gas ducts both commencing from the existing compensator at the outlet of the absorber. The new flue gas ducts continue to two GRP stacks. The diameter of the pipes is 6500 mm. At elevation +37.45m axial, the horizontal flue gas duct passes into the vertical stack.

Project Owner: TPP Maritza East 2 PLC
Main contractor: Partnership Company “MCE-VETRORESINA BALCAN-VITO 95”

Designed: years 2008-2010
In operation since: year 2010

Scope of Work: Design of steel support structure for GRP-stack with a height of 135 metres and flue gas duct. Design of foundation on piles.