PROJECTS
BG | EN

Since the establishment of the company, EKSPRO-2000 realised over 600 designs as a prime contractor or subcontractor for part “Building Structures”. These designs have different scale and complexity.

EKSPRO-2000 prime business focus is the design of building structures of industrial and energy projects in (i.e. nuclear power plants, thermal power plants, gas power plants, water power plants, refineries, pulp and paper factories, chemical plants, metallurgical plants, pharmaceutical plants etc.).

In addition to the industrial designs, the company produces numerous designs of residential buildings, such as family and residential houses, administrative and office buildings, warehouses etc.



 












  • TPP “Maritza East 2” – Temporary flue gas ducts for removal of the flue gas of KA-10 to FGD 7 and FGD 8

Site: TPP “Maritza East 2”

Sub-site: Temporary flue gas ducts extracting flue gas of KA-10 to FGD 7 and FGD 8

Main characteristics of the site:

Completion of a new temporary flue gas duct, which starts after the electrostatic precipitators of Unit 6 and led the flue gas to the flue gas fan of Unit 7 /or Unit 8/. Thus makes it possible in operation of Unit 6 to use FGD of Unit 7 or Unit 8 (when these units do not work for a long period of time).

Project Owner: TPP Maritza East 2 PLC
Contractor: Metalik PLC
Leading designer: TIM EKOTERM ID Limited

Designed: years 2009-2010
In operation since: year 2010

Scope of Work: Detailed design of steel structures and foundations for supporting of temporary flue gas ducts.

BG