  • TPP “Maritza East 2” - Unit 7 and 8 - Flue gas desulphurization system

Site: TPP “Maritza East 2”

Sub-site: Unit 7 and 8 - Flue gas desulphurisation system.

Main characteristics of the site:

Material: steel structure
Height: up to 45 metres
Weight: about 2000 tones

Flue gas desulphurisation system at Units 7 and 8 of TPP “Maritza East 2”. Consists of support structures for flue gas ducts, flue gas ducts themselves, pump building, trestles and steel structures. The site falls under the category of highest difficulty. It is a steel structure with high-strength bolts.

Investor: National Electric Company PLC and
TPP Maritza East 2 PLC
Main contractor: Montage Complect Engineering Limited
Project Owner: Consortium “ Klöckner INA/S-H-U ”, Germany

Designed: years 2001-2002
In operation since: year 2002

Scope of Work: Detailed design in conformity with approved basic design produced by Bureau Heilmann, Germany.